C-65.1, r. 5 - Regulation respecting construction contracts of public bodies

Full text
40.3. The certificate of a contractor is valid until the end of the three-month period following the month in which it was issued.
In addition, the certificate of the contractor must not have been issued after the tender closing date and time or, in the case of a contract entered into by mutual agreement, after the contract award date.
The contractor’s holding a valid certificate issued in accordance with the second paragraph is considered to be an eligibility requirement within the meaning of section 6.
O.C. 845-2011, s. 1; S.Q. 2015, c. 8, s. 130.
40.3. The attestation of a contractor referred to in the first paragraph of section 40.1 must not have been issued more than 90 days before the date and time fixed for the closing of tenders, or after that date and time, or, in the case of a contract entered into by mutual agreement, more than 90 days before the contract award date. The fact that the contractor holds an attestation is considered to be an eligibility requirement within the meaning of section 6.
The attestation of a subcontractor referred to in the second paragraph of section 40.1 must not have been issued more than 90 days before the date fixed for the closing of tenders related to a contract referred to in the first paragraph of section 40.1, nor after the date on which the subcontract is entered into or, if the contract referred to in the first paragraph of section 40.1 is entered into by mutual agreement, more than 90 days before the date on which the subcontract is entered into.
O.C. 845-2011, s. 1.